E-mail: zqdicheng@chinadicheng.com
Quality Assurance & Control of Industrial Blower
All parts of the blower are machined by CNC machining machines to ensure the accuracy and uniformity of all parts. | |
6S workshop site management | Blower lobe dynamic balance test |
Noise and bearing temperature testing during fan operation | |
All blowers are running more than 3 hour before delivery to test the quality. | |
Copyright © Shandong Dacheng Machinery Technology Co., Ltd All Rights Reserved | Sitemap | Powered by